Applications:
- Housing estate and industrial facility construction.
- Infrastructure stability for roads and bridges.
- Forensic analysis for structural failures in mining or municipal projects.
Deliverables:
- Test pit logs and DCP results (PDF).
- Material usage plans (PDF, DWG).
- Forensic investigation reports (PDF).
Timeline: 3 to 10 days (fieldwork: 1 to 4 days; reporting: 2 to 6 days).