Civil Engineering Support

Applications:  

  • Housing estate and industrial facility construction. 
  • Infrastructure stability for roads and bridges. 
  • Forensic analysis for structural failures in mining or municipal projects. 

 Deliverables:  

  • Test pit logs and DCP results (PDF). 
  • Material usage plans (PDF, DWG). 
  • Forensic investigation reports (PDF). 

Timeline: 3 to 10 days (fieldwork: 1 to 4 days; reporting: 2 to 6 days). 

I BUILT MY SITE FOR FREE USING