Applications:
- Foundation design for mining infrastructure (e.g., processing plants).
- Stability assessments for housing estates and industrial sites.
- Geotechnical risk analysis for municipal infrastructure.
Deliverables:
- Geotechnical reports (PDF).
- Foundation recommendations (PDF, DWG).
- Test pit logs and soil profiles.
- Laboratory test results (e.g., shear strength, compaction).
Timeline: 3 to 14 days (fieldwork: 1 to 5 days; analysis + reporting: 2 to 9 days).