Applications:
- Mine water supply and dewatering (e.g., platinum, coal mines).
- Irrigation planning for agricultural farms.
- Municipal water resource management.
- Flood risk assessments for EIAs.
Deliverables:
- Aquifer maps (PDF, GIS).
- Yield and water quality reports (PDF).
- MODFLOW models (digital files).
- Flood risk maps and reports (PDF).
Timeline: 3 to 21 days (fieldwork: 1 to 7 days; analysis + reporting: 2 to 14 days).